A project to alleviate summer traffic to the "beach" was started in 2018 by NJDOT. The work includes 9 message signs, 3 cameras all interconnected to control the flow of traffic by monitoring and controlling traffic lights ( oh boy ) I drive along these routes every week and it appears all the hardware and control interconnected cabling has be done for a long time. My question is what's taking so long for this to be " Turned on "? My guess is Memorial Day weekend NJDOT & Orchard Holdings (contractor)will start debugging the Gremlins in the new system. Cost: $7.9 million Extend Rt55