The failure of the Crest bridge demonstrates why we should compl
AdBlock Detected!
Thank you for reading & participating.
Spout Off is funded by advertising.
Please disable or pause your ad blocker to continue.
West Wildwood - The failure of the Crest bridge demonstrates why we should complete the causeway from the west end of West Willdwood through Frenchmans Cove and out to the Parkway in Middle Township. The original plans were to go around Diamon Point and head West using a portion of the old banner plane runway. With the recent collapse of the railroad bridge near Allan Park, the time is now. Roll it all into one plan with or without the toll.
Print Publication Date:
8/21/2024