I was wondering what the cost overruns are for the flooding prob
AdBlock Detected!
Thank you for reading & participating.
Spout Off is funded by advertising.
Please disable or pause your ad blocker to continue.
Cold Spring - I was wondering what the cost overruns are for the flooding problem on Suzanne Ave. in Lower Township. Remember, that would be an indication of overruns for the pool that is on hold until after the elections.
Print Publication Date:
7/17/2019